Shoring Solution Quick Index
IMPORTANT NOTICE:
In any photo there will always be something that might reduce the level of compliance under the most strict application of the OSHA standard. The Shoring Solution Library is meant to be a resource guide of possibilities which can lead you closer to compliance. Some critics have suggested that we post ONLY perfect photos. Perfect jobsite photos are rare. Our philosophy is that the GREATER GOOD is served by sharing our Shoring Solution Library (however imperfect) showing application technology in the "real world". As the Contractor or Competent Person, it is up to you to make the job as compliant as possible. If you don't know how, we offer monthly FREE CPT Excavation Safety classes in each of our facilities.
Search the Solution Quick Index
4 Steel
Back to top- 023-025. 4’ stacking sequence
- 039a. Topping the competition
6 Steel
Back to top- 038n. Plumbers Box used on End
8 Steel
Back to top- 005a. LE on legs
- 017a. Conduit drops
- 035. Multiple deep stacks
- 036a. Booster box add-on
- 036b. Booster box add-on
- 036c. Booster box add-on
- 036c. Booster box add-on
- 036d. Booster boxes paired
- 036e. Wellpointing
- 037a. 12' Box
- 037b. Single booster box
- 038a. 10 x 16 assembly
- 038b. 10 x 16 end B
- 038c. 10 x 16 end A
- 038e. 3 box pipe junction
- 038g. Camp cup
- 038h. CEV install
- 038i. CEV install 2
- 038j. Drop manhole install
- 038k. Drop manhole install 2
- 038l. 10 x 16 single wall box
- 039b. 10 x 16' box
Additional Equipment
Back to top- 010a. Pipe plug in use
- 010b. Pipe plug in use
- 010c. Pipe plug in use
Advanced Solutions
Back to top- 005a. LE on legs
- 017a. Conduit drops
- 025a. Wheel kit
- 033a. Wide aluminum spreaders
- 036e. Wellpointing
- 037b. Single booster box
- 038e. 3 box pipe junction
- 038g. Camp cup
- 038h. CEV install
- 038i. CEV install 2
- 038j. Drop manhole install
- 038k. Drop manhole install 2
- 038n. Plumbers Box used on End
- 058a. Extended 4 sided
- 071b. 1 sided stancion
- 080a. Jumbos over framework
- 092a. End view jumbo
- 146a. Boxes end to end
- 181. Welder’s huts
- 183. Leap frog boxes
- 193. Ramp with handrail
- 197. Blast wall
- 198. Blast wall
- 220. Camp cup solution
Bedding Boxes
Back to top- 009a. Bedding box in use
- 009b. Beddng box
- 009c. Lone bedding box
- 201. Bedding box in use
- 251. Bedding box in use
Bore Pits
Back to top- 133a. Dueling bore pits
- 133b. Jumbo inverted bore pit
- 218. Bore pit
Bridge Panels
Back to top- 146a. Boxes end to end
- 146c. Bridge panels in action
- 146d. Bridge panels in action
Doghouse Solutions
Back to top- 041. "In the Doghouse"
End Closure
Back to top- 135a. AS PRO with end panels
- 135b. AS PRO with end panels
- 135c. AS PRO with end panels
- 143a. End panel inside
- 143b. End panel outside (top)
- 143c. Typical End Closure
H-Beams
Back to top- 118a. Beam placement
- 118d. Beam and Panels
- 118e. Beam and Panels
- 202a. Setting beam in place
- 202b. Setting beam in place
- 202c. Setting beam in caisson
- 202d. Filling in flowable fill
- 202e. Drilling machine
- 202f. Setting beam
- 202g. Pulling caisson
- 202h. Setting beam
- 202i. Pulling caisson
- 202j. Picking up beam
- 235. Beam and plate wall
- 241. Getting ready
- 248. Beam and Plate wall
- 249. Beam and Plate wall
- 263. Beam and Plate wall
- 273. Beam and Plate wall
- 502f. Setting H-Beam in place
Handling and Rigging
Back to top- 272. TSS delivery truck
High Clearance
Back to top- 082a. End view jumbo
- 084a. Mini Jumbo assembly
- 084b. Mini Jumbo assembly
- 084c. Mini Jumbo assembly
- 084d. Mini Jumbo assembly
- 084e. Mini Jumbo assembly
- 085a. Wide jumbo assembly
- 085b. Jumbo in sling
- 088. Complex configuration using 4 jumbo spreaders to connect 2 8’ panels to allow for re-bar clearance
- 092a. End view jumbo
- 092b. Plenty o' jumbos
- 094a. Jumbo Assembly 1
- 094b. Jumbo Assembly 2
- 094c. Jumbo Assembly 3
- 094d. Jumbo Assembly 4
- 094e. Jumbo Assembly 5
- 094f. Jumbo Assembly 6
- 094g. Jumbo with single box
- 094i. Mini-Jumbos at work
- 094k. 4-sided Jumbo assembly
- 217. Using mini-jumbos
Manhole Casings
Back to top- 072. Happy Halloween!
Medium Duty Aluminum
Back to top- ASP015a. AS/PRO vault installation
- ASP015b. AS/PRO vault installation
- ASP015c. Forming with AS/PRO
- ASP015d. Lowering AS/PRO with lifting sling
- ASP015e. Lowering AS/PRO with lifting sling
- ASP015g. Stacked AS/PRO boxes
- ASP015h. AS/PRO in use
- ASP015h. Narrow AS/PRO boxes
- ASP015i. Using an AS/PRO to prepare formwork
- ASP015j. Using an AS/PRO to set formwork
- ASP015k. A really narrow AS/PRO
- ASP015l. Using AS/PRO boxes end to end
- ASP015n. Keeping it narrow with AS/PRO's
- ASP015o. Standing an AS/PRO on its end
- ASP015p. Stacking with AS/PRO's
- ASP015q. Stacking AS/PRO on steel
- ASP015r. Stacking steel on AS/PRO
Multi-sided Solutions
Back to top- 051a. 3-sided
- 058a. Extended 4 sided
- 061a. Inside cofferdam
- 061b. Outside cofferdam
- 063a. Carrying a 4 sided box
- 063b. Carrying a 4 sided box
- 069. 8’ 4-sided stack
- 069a. 4 sided manhole
- 069b. Deep 4 sided (LE)
- 070a. 4 sided w/end panels
- 071a. HE stack w/ladder
- 071g. Simple 4-Sided solution
- 208. Setting a divers box
- 216. High-side protection
Road Plates
Back to top- 157. DON’T DO THIS!
- 158i. Bridging over pump hose
- 158k. Plating on bridge panels
- 270. Highway rated
Shoring Frames
Back to top- 095a. Lifting a shoring frame
- 104c. Step 2 -Getting Ready
- 104d. Step 3 -Standing Up
- 104e. Step 4 -Stood Up
- 104f. Step 5 -Walking Over
- 104i. Step 8 -Installed
Tank Pits
Back to topultraSHORE
Back to top- A010a. Mini ex with aluminum
- A025a. Wheel kit for shoring
- A033a. Wide aluminum spreaders
- A67. Preparing a grave
- A69. Shoring the grave